In March 2019, Hunan Huiying iron and Steel Co., Ltd. participated in the bidding work of Beijing Tangshan intercity railway of China Railway 14th Bureau, and had the honor to win the bid for the project department's procurement of finish rolled rebar. It is reported that the supply of finish rolled rebar is 32mm Finished Deformed Bar The steel bar is one of the most commonly used steel bars in Railway Engineering, and the size of the steel bar is relatively large Psb830 grade finish rolled rebar The tensile strength can reach 1000 MPa and the total tensile force is about 80 tons. The reinforcement can effectively ensure the application of railway engineering.

Psb830 finish rolled ribbed bar

32mmpsb830 finish rolled ribbed bar
The Beijing Tangshan intercity railway is located in the Bohai Sea, Beijing Tianjin Hebei region. The line starts from Tongzhou District of Beijing and ends in Tangshan City, Hebei Province, with a total length of 148.74km. The route is nearly east-west, passing through Tongzhou District of Beijing, Langfang city of Hebei Province (Yanjiao, Dachang and Xianghe of Sanhe City), Baodi District of Tianjin city and Tangshan City (Yutian County and Fengrun District) of Hebei Province. The finished rolled rebar supplied this time is located in Fengrun District of Tangshan, which is the terminal section of the line. The line grade of Beijing Tangshan intercity railway project is passenger dedicated line, the number of main lines is double track, electric traction, the train type is EMU, and the effective length of station arrival departure track is 650m. The total length of the newly-built Beijing Tangshan inter city railway line is about 749.03km, which is about 789.03km for Beijing Tangshan railway.